![]() |
Surveys are usually conducted on an annual basis and consist of two particular tests.
Firstly a wipe test is conducted to test for loose radioactive particles that have found their way to the surface of the Source Holder.
Second is a Radiation Level test at 50mm and 1 metre from the Source Holder. This second test checks that the integrity of the Source Holder has not been compromised in any way.
A Nuclear Australia engineer will visit your site and perform the survey. At the conclusion of on-site testing an "on-the-spot" certificate is supplied for your records.
We have Three Licensed Engineers on staff, all of whom are competent in our range of products and services. We have been associated with the design, manufacture, installation commissioning and maintenance of Radiation Detection And Measuring equipment since 1976.


